1
0
mirror of https://github.com/TomHarte/CLK.git synced 2024-11-16 19:08:08 +00:00
Commit Graph

68 Commits

Author SHA1 Message Date
Thomas Harte
1c0b5bb02b Corrects phoney switch of 'run' build to release. 2018-05-04 18:04:23 -04:00
Thomas Harte
723ee88043 Introduces configuration options for the Apple II.
Specifically: II or II+? Disk II 13- or 16-sector? Or not at all?
2018-05-03 19:37:32 -04:00
Thomas Harte
389979923e Performs update to and satisfaction of Xcode 9.3's preferred warnings. 2018-03-30 10:25:01 -04:00
Thomas Harte
e1cab52c84 Ensures thread safety of access to machines array. 2018-02-10 19:38:26 -05:00
Thomas Harte
2ffde4c3c2 Corrects SCC volume errors.
Which were leading to substantial overflow.
2018-01-07 09:59:00 -05:00
Thomas Harte
16c96b605a Xcode 9.1 auto-change. 2017-11-07 22:43:25 -05:00
Thomas Harte
e983854e71 Converts all uint8_t and uint16_t casts to the functional style. 2017-10-21 21:50:53 -04:00
Thomas Harte
231f13d810 Updates to Swift 4 and Xcode 9's recommended project settings. 2017-09-19 23:06:37 -04:00
Thomas Harte
279c369a1f Switched to Cycles as the result from the 6502 perform_bus_operation, helping slightly to clarify what you're intended to return and reducing type jumping within the 6502 implementation. 2017-07-25 22:21:09 -04:00
Thomas Harte
cb105fdeb4 Took a first stab at high-res support. 2017-06-22 22:48:17 -04:00
Thomas Harte
aec4fd066b I think I've definitively decided against this model of timing. 2017-06-22 21:32:14 -04:00
Thomas Harte
8c1769f157 Made a quick attempt at serialising from ZX80 .O to waves. 2017-06-04 16:59:26 -04:00
Thomas Harte
7bddd294c9 Resolved an unpredictable conditional and temporarily disabled the Zexalltest as part of the default suite, since it takes so long to run. 2017-05-30 21:03:02 -04:00
Thomas Harte
c6185baa99 Fixed R incrementation and attempted to make the status flags cheaper to write to. 2017-05-29 22:23:19 -04:00
Thomas Harte
4d4695032c Discovered that Zexall is just really slow. Disabled the address sanitiser, and started working towards a verifiable end. 2017-05-29 21:46:00 -04:00
Thomas Harte
01a064dd63 Added an empty ED page. 2017-05-20 17:29:30 -04:00
Thomas Harte
a72d70e707 Enabled code coverage calculation for unit tests. 2017-03-11 17:44:56 -05:00
Thomas Harte
7b696b0962 Switched scheme to shared. 2016-12-31 13:11:07 -05:00