1
0
mirror of https://github.com/TomHarte/CLK.git synced 2024-11-30 04:50:08 +00:00
Commit Graph

5064 Commits

Author SHA1 Message Date
Thomas Harte
210bcaa56d Introduces an initial shift unit test, and makes it pass. 2019-07-07 22:13:36 -04:00
Thomas Harte
d7329c1bdd Experiments with a timeout on keyboard interactions. 2019-07-07 14:13:55 -04:00
Thomas Harte
a5f0761a43 Copies in notes for required test functions. 2019-07-07 14:13:00 -04:00
Thomas Harte
dd963d6161 Eliminates call/return cost on WrappedInts. 2019-07-07 14:12:20 -04:00
Thomas Harte
96c0253ee2 Fixes mouse input when a button is pressed; attempts keyboard input.
I think the VIA is somehow sending spurious commands.
2019-07-02 21:14:33 -04:00
Thomas Harte
191a7a9386 Reintroduces an empty second drive.
This prevents the uninitialised disk error. Which is a clue.
2019-07-02 16:59:00 -04:00
Thomas Harte
387be4a0a6 Ensures mouse button presses propagate correctly.
Beyond the one that initiates mouse capture, that is.
2019-07-02 16:57:51 -04:00
Thomas Harte
b9c2c42bc0 Switches drives to using floats for time counting.
Hopefully to eliminate a lot of unnecessary `Time` work; inaccuracies should still be within tolerable range.
2019-07-02 15:43:03 -04:00
Thomas Harte
fffe6ed2df Chops the Macintosh down to a single drive to aid in development. 2019-07-02 13:59:30 -04:00
Thomas Harte
c4cbe9476c Corrects EA selection logic, fixing MOVEP. 2019-07-02 13:54:21 -04:00
Thomas Harte
0a67cc3dab Goes nuclear on ROXL and ROXR. 2019-07-01 23:05:48 -04:00
Thomas Harte
726e07ed5b Corrects ASL overflow flag. 2019-07-01 19:46:58 -04:00
Thomas Harte
ebb6313eef Corrects missing file. 2019-07-01 18:18:46 -04:00
Thomas Harte
11d8f765b2 Corrects divide-by-zero exception length, enables all other DIVS checks. 2019-07-01 15:46:04 -04:00
Thomas Harte
514e57b3e9 Corrects DIVU timing and flags, improves DIVS. 2019-07-01 14:24:32 -04:00
Thomas Harte
d8fb6fb951 Corrects MULU timing. 2019-06-30 22:40:10 -04:00
Thomas Harte
255f0d4b2a Corrects MULS timing. 2019-06-30 22:33:54 -04:00
Thomas Harte
d30e7504c2 Factors out MOVE tests, and ensures test machine RAM is zero initialised. 2019-06-30 21:43:30 -04:00
Thomas Harte
8d0cd356fd Corrects TRAP, TRAPV and CHK timing. 2019-06-29 21:25:22 -04:00
Thomas Harte
aff40bf00a Imports AND tests. 2019-06-29 20:16:10 -04:00
Thomas Harte
eedf7358b4 Imports first part of AND tests. 2019-06-29 16:29:47 -04:00
Thomas Harte
26aebcc167 Imports ROXL and ROXR tests.
Confirming the significant deficiencies I suspected.
2019-06-29 15:26:09 -04:00
Thomas Harte
9d420c727e Factors out rolls and shifts. 2019-06-29 14:12:52 -04:00
Thomas Harte
60fe84ad16 Imports Bcc tests. 2019-06-29 14:07:21 -04:00
Thomas Harte
6a44c682ad Factors out control flow tests. 2019-06-29 13:47:05 -04:00
Thomas Harte
60df44f0ca Imports CMPI tests. 2019-06-29 13:40:02 -04:00
Thomas Harte
ac926f5070 Factors BCD out of general arithmetic. 2019-06-29 13:31:24 -04:00
Thomas Harte
6e9a4a48f7 Imports TAS tests. 2019-06-28 22:56:35 -04:00
Thomas Harte
a8894b308a Splits out arithmetic tests, as so far implemented.
Further subdivision may be advisable.
2019-06-28 22:08:32 -04:00
Thomas Harte
7cc91e1bc5 Factors the bitwise tests out of the main bundle, as that pushes up towards 6,000 lines. 2019-06-28 21:58:38 -04:00
Thomas Harte
9eb51f164c Imports ANDI, ORI and EORI tests. 2019-06-28 21:42:58 -04:00
Thomas Harte
a1c00e9318 Adds BSR tests. 2019-06-28 21:31:41 -04:00
Thomas Harte
17666bc059 Corrects CHK flags. 2019-06-28 19:48:53 -04:00
Thomas Harte
241d29ff7c Imports SBCD and NBCD tests, and fixes corresponding operation. 2019-06-28 19:39:08 -04:00
Thomas Harte
c5039a4719 Imports ANDI, ORI and EORI to SR tests.
Hence corrects supervisor/user privileges for SR/CCR.
2019-06-28 15:05:46 -04:00
Thomas Harte
fd604048db Imports SUBX tests. 2019-06-28 14:30:26 -04:00
Thomas Harte
6a77ed1e07 Imports SUBI test. 2019-06-28 13:53:53 -04:00
Thomas Harte
9e38815ec4 Imports SUBQ tests. 2019-06-28 13:48:02 -04:00
Thomas Harte
86c325c4ec Imports MOVEA tests. 2019-06-28 13:41:37 -04:00
Thomas Harte
bfcc6cf12c Imports MULU tests.
Timing is wrong for now.
2019-06-28 13:33:41 -04:00
Thomas Harte
8ba8cf7c23 Imports TST tests. 2019-06-28 13:17:21 -04:00
Thomas Harte
6c588a1510 Makes some further random swings at tracking the startup procedure. 2019-06-28 13:03:47 -04:00
Thomas Harte
651fd9c4a5 Imports EOR tests. 2019-06-28 13:03:27 -04:00
Thomas Harte
5d0db2198c Imports BRA, EORI CCR and ORI CCR tests, extends PEA tests. 2019-06-27 23:05:00 -04:00
Thomas Harte
d81053ea38 Invents some additional PEA tests, and further fixes PEA. 2019-06-27 17:59:03 -04:00
Thomas Harte
8d39c3bc98 Takes a shot at fixing PEA for A7-relative addresses.
Unit tests required. Tomorrow.
2019-06-26 23:24:54 -04:00
Thomas Harte
da351a3e32 Imports MOVEQ tests. 2019-06-26 22:36:48 -04:00
Thomas Harte
c0591090f5 Imports DIVU tests. 2019-06-26 22:25:48 -04:00
Thomas Harte
538aecb46e Imports CMP tests, and fixes CMP.l timing. 2019-06-26 22:02:04 -04:00
Thomas Harte
dbdbea85c2 Imports CMPA tests, and fixes CMPA.w. 2019-06-26 21:42:48 -04:00